Category

Area

Bicycle Assembly Unit

( Industry, sub-division: Bicycle Assembly

free zone anzali

Description

General introduction of the project

The project concerns on construction of a bicycle assembly center. Taking into account requirements of country as well as capabilities and potential of the Anzali Free Zone for the entrance of CKD components, this project is regarded as an investment opportunity. This endeavor requires 1500 square meters of land, 1000 square meters of infrastructure, and employment of 22 individuals.

The purpose of project implementation

The project involves the construction of a bicycle assembly center. This project has been identified as an investment opportunity in light of the capabilities and legal advantages of Anzali Free Zone for the implementation of industrial and production projects.

Special advantages of the region

  •  Twenty-year tax exemption for all activities and in all fields from date of operation mentioned in the economic activity license.
  •   It is possible to import devices, machines, parts and equipment required for investment projects from abroad by paying consumption duties in the region.
  • No need to obtain prior visas for the entry of foreign nationals and possibility of issuing employment permits for foreign employees and experts.
  • The possibility of importing raw materials, devices, machines and parts needed by factories and production units without paying customs duties.
  • Sending products into country and not paying customs duties up to value-added determined by Value-Added Commission of Free and Special Economic Zones.
  • The possibility of engagement with international investors without participation ratio constraints and possibility of 100% foreign investment.
  • Total freedom of entrance and departure for capital and economic activity profits.
  • The freedom to transfer foreign currencies without limitation.
  • The possibility of selling land to Iranian investors and international individuals who register a company in the Anzali zone.

Special advantages of the region

  • Exporting products abroad without paying customs duties.
  • Presence of swift action in carrying out affairs and minimal administrative bureaucracy.
  • Exploiting the Caspian Port Complex of Anzali zone as the largest Iranian port in e north of country with a port appropriate backyard for providing logistics services and establishing and operating industrial units.
  • Enjoying an exceptional position in transportation and transit in Anzali zone due to being in the north-south corridor.
  • Location of the demographic pole of the country (northwest quarter).
  • The anticipated connection of the Caspian port to the Qazvin-Rasht railway
  • The presence of natural attractions of the sea, forest and wetland in Anzali Free Zone.
  • Construction of recreational infrastructure within the zone, including the establishment of a recreational marina as only marina in north of the country, a coastal park, a marine recreation center, a beach pool, the most equipped center for international conferences and exhibitions in the north of country, a bird paradise, aquarium complex, and reptile garden, as well as complexes and active shopping centers that attract millions of tourists annually.
  • Enjoying favorable climatic conditions and very pleasant weather, as well as four-season nature and fertile soil.
  • Access to enough and qualified human resources
  • Having distinctive and unique natural tourist resources, including the Caspian Seas beaches, forests, and lagoon.
  • The closest free zone to the countrys capital.
  • Proximity to Rashts Sardar Jangal International Airport.
  • Proximity to and possibility of maritime connection with ports of Astra Khan, Russia, Aktao in Kazakhstan, Turkmenbashi, Turkmenistan, and Baku, Azerbaijan.
  • Existence of a market with population of approximately 400 million in the Caspian Sea, CIS, and Caucasus regions.
  • Existence of two industrial estate with infrastructural facilities for establishment of production units and construction plan for industrial estate No. 3 in the zone.

Land area

1500 Square meters

infrastructure area

1000 Square meters

production capacity

0 tone / year

Construction period

24 months

domestic raw materials

24

Foreign raw materials

100

direct employment

22

indirect employment

44

Financial Information

1 Dollar =

No data was found

Rial

Fixed investment

284.500.000.000

Estimated operating costs

24.675.000.000

Operating income

0

Working capital

170.700.000.000

Net operating profit

0

0%

Benefit to cost ratio

4

Return period

39%

Internal rate of return

Is a feasibility study available?

Is the required land prepared?

Are legal permits prepared?

Has the infrastructure been prepared?

Gallery Project

consultation request

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua Egestas purus viverra accumsan in nisl nisi Arcu cursus vitae congue mauris rhoncus aenean vel