General introduction of the project

This project is considered as one of the 5 industrial units in the scope predicted for the downstream petrochemical industry complex in an area of 300 thousand square meters with an annual capacity of 10 thousand tons.

The purpose of project implementation

Creating added value for complex products and raw materials and preventing raw sales The absence of a similar and competing complex near this complex and even in the country (there is no similar Polystal unit) The existence of the merchant border capaci

Special advantages of the region

  • Having an exceptional position in the transportation and transit of goods due to the connection to the markets of Europe and Central Asia
  • Having an airport with an air border holding the possibility of handling international flights
  • Allotment of land with suitable conditions for investment
  • Converting 60 km of regional roads into highways
  • Existence of Irans largest and the most important land customs (Bazargan) in the zone adjacent to the Poldasht Customs
  • Having well-equipped and under development logistics infrastructure (warehouses and T.I.R parks) to facilitate export and import
  • Location of a significant part of Aras border river in the zone and the presence of Aras dam and other dams such as Karamabad
  • Existence of vast lands for various agricultural activities (agriculture, horticulture, animal husbandry, fisheries)
  • Existence of constructional and ornamental stone mines of Travertine, Basaltic and Marble and also non-metal mines of Magnetite and Silica.
  • Having a power plant with foreign investment
  • Existence of an under construction cement factory and all kinds of building materials
  •  Existence of gas transmission pipelines to supply gas for energy consuming industries
  • Existence of industrial towns for specialized industries (light, semi-heavy, energy-consuming)
  • Being the passageway of tourists to Turkey and Europe, creating the basis for businesses benefiting from these trips
  • A significant active and ready-to-work population of over 50,000 people

Land area

300000 Square meters

infrastructure area

50000 Square meters

production capacity

Construction period

24 months

domestic raw materials

24

Foreign raw materials

100

direct employment

70

indirect employment

11

Financial Information

1 Dollar =

No data was found

Rial

Fixed investment

49.550.000.000.000

Estimated operating costs

0

Operating income

0

Working capital

8.000.000.000.000

Net operating profit

0

0%

Benefit to cost ratio

2.6

Return period

38%

Internal rate of return

Is a feasibility study available?

Is the required land prepared?

Are legal permits prepared?

Has the infrastructure been prepared?